Maps and Plans
The files below are in Portable Document Format (PDF). You will need Adobe Acrobat Reader, which is available free from the internet to view the files.
- Project Study Area – Aerial Map – 250′ limits
- Project Study Area – Aerial Map – 500′ limits
- Environmental Constraints Map
- Fixed Bridge Replacement Plan – Preliminary Preferred Alternative (PPA)
- Cross Section of Bridge (existing and proposed)
- Written Description of Bridge Replacement – Preliminary Preferred Alternative (PPA)
- Detour Plan
- Rendering of new bridge – aerial view
- Rendering of new bridge – view from river
Archives
Local Capital Project Delivery Process
Purpose & Need Statement
Data Collection & Environmental Screening Report
Selection of Preliminary Preferred Alternative
Concept Development Report
NEPA Classification
Create Design Communications Report
Initial Public Outreach & Involvement
Approved Design Exception Report
Cost Estimates (Final Design, ROW & Construction)
Approved Environmental Document
Approved Project Plan
Preliminary Engineering Report
Update Design Communications Report
Continued Public Outreach & Involvement
Construction Contract Documents & PS&E Package
Environmental Reevaluations
Environmental Permits
Acquisition of ROW
Update Design Communications Report
Continued Public Outreach & Involvement
Implement and Complete Construction
Continue Public Outreach
As-Builts
Update and Finalize Design Communications Report
Close-out Documentation
Recent News
Two renderings have been created to visualize what the new bridge will look like
The Local Concept Development (LCD) Study that was completed in 2020 and is now advancing to the Local Preliminary Engineering (LPE) Phase using federal funding.
Public Information Center meetings were held on December 12, 2019 and the public comment period ended January 17, 2020. Click here to see the presentation.